Elective E1 Operational Technology

Version 0.1.1 · Last reviewed 2026-11-13 · Adapted from existing material

What you will be able to do

Lessons

The lessons, exercise, and quiz are for registered learners. Create a free account or sign in to read them.

  1. 1. What Makes Operational Technology Different · 35 min
  2. 2. Categorizing and Scoping OT · 40 min
  3. 3. Applying Controls in OT · 45 min
  4. 4. Assessing and Monitoring OT Safely · 35 min

Practice and quiz

Overview

This elective is for ISSOs who meet systems that control the physical world: building automation, laboratory environments, access control, utilities, and industrial processes. It uses the fictional SentinelBAS, the building automation and access platform at a high-containment biological laboratory that you met in Modules 2 and 3.

It is not needed for the capstone. It needs Module 3, since it builds on baselines and tailoring.

Lessons

# Lesson Time Status
1 What Makes Operational Technology Different 35 min Adapted
2 Categorizing and Scoping OT 40 min Adapted
3 Applying Controls in OT 45 min Adapted
4 Assessing and Monitoring OT Safely 35 min Adapted

What is binding here, and what is guidance

Source cited in this elective Kind Why it has that status
FISMA Binding statute OT used by or for an agency is generally a federal information system
FIPS 199 Binding standard Categorization, including physical harm to individuals and assets
CISA BOD 26-04 Binding on federal civilian agencies Applies to vulnerable assets, including OT; how is set by agency policy
OMB M-26-14 Binding policy Logging coverage includes OT
NIST SP 800-82 Rev. 3 and its OT overlay Guidance The main federal OT security guide
NIST SP 800-53, 800-53A, 800-53B, 800-137 Guidance, required in practice As in earlier modules
ISA/IEC 62443 Industry consensus standard Widely used; not a federal requirement
Agency facility safety procedures Binding within the agency Safety review and maintenance windows

Module summary

  • OT monitors or controls physical processes. Safety and availability come first.
  • Old devices, insecure protocols, real-time operation, and vendor dependence make standard IT practice risky.
  • Draw the boundary to include controllers and the connections that reach them; list every crossing.
  • Categorize on physical consequences; High brings the High baseline and the OT overlay, and needs a transition plan.
  • When a device cannot meet a control, meet its purpose another way and state the residual risk honestly.
  • Segment into zones and conduits; control vendor remote access session by session.
  • Assess and monitor passively wherever possible, under rules of engagement agreed with engineers and safety staff.

What comes next

The other elective, E2 GRC Engineering, needs Module 5.

Last reviewed 2026-11-13. Federal requirements, dates, and web addresses change. Before you rely on a date, deadline, or figure, open the source linked in the lesson.