Module 6 Authorization and the ATO Package

Version 0.1.0 · Last reviewed 2026-11-11 · Adapted from existing material

What you will be able to do

Lessons

The lessons, exercise, and quiz are for registered learners. Create a free account or sign in to read them.

  1. 1. The Authorization Package and the Decision · 35 min
  2. 2. Determining and Accepting Risk · 40 min
  3. 3. Kinds of Decision: Authorizations, Conditions, and Denials · 40 min
  4. 4. Ten Ways Authorization Packages Fail · 35 min
  5. 5. After the Signature · 30 min

Practice and quiz

Overview

The security plan is written, the assessment is done, and the open weaknesses are listed. This module covers the Authorize step of the Risk Management Framework: assembling those into a package, turning findings into a statement of risk, and the decision itself, with its variants and conditions.

The Information System Security Officer (ISSO) does not make the decision. The ISSO does most of the work that makes a sound decision possible, and carries the conditions afterward. The recurring theme is honesty: the authorizing official is entitled to the real position, stated plainly.

Builds on

  • Module 5, Lessons 4 and 5: findings and the assessment report, which become the raw material for risk statements.
  • Module 4: the security plan, the first document in the package.
  • Module 2, Lesson 4: categorization set threat aside. Here threat and likelihood come back in.
  • Module 1, Lesson 3: the authorizing official, who alone can accept risk.

Lessons

# Lesson Time Status
1 The Authorization Package and the Decision 35 min Adapted from existing material
2 Determining and Accepting Risk 40 min Adapted
3 Kinds of Decision: Authorizations, Conditions, and Denials 40 min Adapted
4 Ten Ways Authorization Packages Fail 35 min Adapted
5 After the Signature 30 min New

What is binding here, and what is guidance

Source cited in this module Kind Why it has that status
FISMA Binding statute Makes agency heads responsible and requires risk-based protection
OMB Circular A-130 Binding policy Requires systems to be authorized by a senior official before operating, and permits ongoing authorization
NIST SP 800-37 (Authorize step; decision types) Guidance, required in practice Applied through Circular A-130
NIST SP 800-39, SP 800-30 Guidance Risk management and risk assessment methods
NIST SP 800-53, control CA-6 Guidance, required in practice Selected in every baseline
Agency risk tolerance Binding within the agency Set at the organization level
Agency authorization policy and templates Binding within the agency Defines the required package contents and local terms
"Interim authorization to test," "conditional ATO" Agency practice Widely used terms that are not NIST decision types as such; meaning is set by agency policy
Three-year reauthorization cycle Agency policy where used Not a universal federal rule
The signed authorization decision and its conditions Binding on the system It is the official's direction

Module summary

  • The package is the security plan, the assessment report, the plan of action and milestones, and an executive summary, with supporting documents as agency policy requires.
  • Complete is not enough. The documents must agree with one another; run the consistency links before submitting.
  • Findings are not risk. Risk says what could happen, how likely, and how much it would matter, taking other controls into account.
  • Risk is accepted only by the authorizing official, explicitly, in a signed decision. Running the system, listing a weakness, or silence is not acceptance.
  • A residual risk statement names the gap, the possible consequence, what reduces it, and what remains.
  • NIST guidance describes authorization to operate, common control authorization, authorization to use, and denial. Conditions make an authorization "yes, provided that." Use the instrument that fits.
  • Packages fail in ten predictable ways, nearly all preventable long before the Authorize step.
  • After the signature, track the conditions, watch the dates, and keep the official informed.

What comes next

Module 7 covers the longest step: continuous monitoring, managing change, and running the plan of action and milestones so that the authorization stays true.

Last reviewed 2026-11-11. Federal requirements, dates, and web addresses change. Before you rely on a date, deadline, or figure, open the source linked in the lesson.